CRG Automation stays true to our proven process to design, build and integrate packaging solutions to meet our customer’s needs.Our process outlines the steps we take to ensure each element of your project is managed, each step of the way.

  1. Discovery – This is the most crucial step of the process. CRG takes the time to get a full understanding of our customer’s current process, challenges, needs and desired outcome. Our team conducts facility visits to complete a detailed analysis of the current process, product specifics and performance metrics.
  2. Preliminary solution review – this step ensures that CRG understands our customer’s needs and vision. We facilitate a review of preliminary drawings and equipment and verify both CRG and our customer are in complete alignment on the project.
  3. Formal Proposal – this is where we shine, our proposals touch on each aspect of the proposed solution including performance metrics as specified by the customer, electrical and mechanical detail and project drawings (with optional 3d scanning and modeling available). When we partner with a customer, we leave no stone un-turned and no questions unanswered. After acceptance of the proposal, we turn on the green-light and hit the gas!
  4. Project Handoff – each customer will have a dedicated project manager; this gives the customer one point of contact throughout the process. The project manager leads the charge with mechanical and electrical engineering and reports to the customer with regular project updates.
  5. Mechanical and Electrical Engineering – systems are designed to meet the customer’s specific needs. This includes safety specifications; preferred system controls and integration needs with existing equipment.
  6. Procurement & Fabrication – purchasing works with our industry leading network of partners to ensure that we use the highest quality components and get them in time to meet project deadlines. Using this network ensures high quality, cost control and timely delivery.
  7. Build and Test – our customer’s solutions are built and tested onsite at our facility, by our experienced team of fabricators, technicians and engineers in person, with our customers. Factory Acceptance Tests (FAT) are performed with the customer to prove our custom solution meets/exceeds their performance metrics.
  8. Site set-up and performance testing – CRG will send qualified technicians and engineers to oversee the installation of our customers systems. Site Acceptance Testing (SAT) is also available to ensure the newly installed system performs as designed.
  9. Post installation service and Training – the relationship doesn’t end after installation! CRG offers post installation service and operator and maintenance training for our customers.